🇵🇱 Poland · Guarded centre (Border Guard)position placed by hand or derived from the address

Przemyśl Guarded Centre for Foreigners and Arrest for Foreigners

ul. Mickiewicza 34, 37-700 Przemyśl · Przemyśl, Subcarpathian Voivodeship

Capacity: 171 places (as at 31 December 2025).

People counted there: 153 (as at 31 December 2025).

In use (status as at: 31 December 2025)

Immigration detention, not accommodation

This is a place of custody pending removal. It is not accommodation, its places are not counted as accommodation capacity anywhere on this site, and it is shown apart from the reception sites.

Border Guard guarded centres hold foreigners under a court order. Their 2025 costs include staff, unlike the figures for the Office for Foreigners' reception centres, so the two sets of figures are not comparable and are not added together.

The Przemyśl Guarded Centre for Foreigners is a Border Guard detention centre in the complex of the Bieszczadzki Border Guard command, ul. Mickiewicza 34, Przemyśl (Subcarpathian Voivodeship). It holds men, and the only arrest for foreigners (areszt dla cudzoziemców) in Poland is on the same site. At the end of 2025 the guarded centre had 147 places and 133 people held, and the arrest unit had 24 places and 20 people held (AIDA). It is not accommodation, and its places are not accommodation capacity.

Key facts

Type
Border Guard guarded centre for foreigners (detention)
Operator
Border Guard (Bieszczadzki unit)[2]
Address
ul. Mickiewicza 34, 37-700 Przemyśl. This is the address of the Bieszczadzki Border Guard command. The Border Guard says that the centre is within the command complex.[2],[3]
Capacity
171 places at the end of 2025: 147 in the guarded centre and 24 in the arrest unit (AIDA).[4]
People held
153 at the end of 2025: 133 in the guarded centre and 20 in the arrest unit (AIDA). The Border Guard said in July 2023 that about 70 adult men were held in the centre.[2],[4]
Status
In use at the end of 2025.[4]
Opening
The Border Guard said in July 2023 that the centre had existed for over 15 years. The sources used give no opening date.[2]
Cost in 2025
PLN 22,732,964.10, of which staff PLN 18,344,020.98 (Interior Ministry reply of March 2026). Staff are included here, unlike in the reception centre figures.[1]
Held and deported in 2025
The ministry's reply of March 2026 gives, for 2025, 493 people held and 174 people deported.[1]
Position of the pin
The pin is at the address of the command, about 90 m from the centre of the command complex shown in OpenStreetMap. The exact building of the centre is not confirmed.[3]

Background

Guarded centres for foreigners are run by the Border Guard. People are placed in them by court order, pending removal. They hold foreigners, including people who have applied for international protection. They are separate from the open reception centres run by the Office for Foreigners.[4],[5]

At the end of 2025, five guarded centres were in use (Biała Podlaska, Białystok, Kętrzyn, Lesznowola and Przemyśl), with 1,032 places and 795 people held in total, counting the arrest unit in Przemyśl (AIDA). The Krosno Odrzańskie centre has been out of use since 1 October 2024.[4],[6]

The 2025 costs of the guarded centres come from the Interior Ministry's replies to interpellations 14740 to 14745 (March 2026). Unlike the figures for the reception centres, they include staff, so the two sets of figures are not comparable and are not added together.[7]

Reported incidents

Incidents connected with this site that official or mainstream sources have reported, each attributed, with the stage reached as the source states it. Suspects are not named. Counts of police interventions are the Interior Ministry's own and are not criminal charges.

No incident connected with this site is recorded in the sources listed on this page.

Sources

  1. MSWiA, odpowiedź na interpelację nr 14745 (03.2026)
  2. Straż Graniczna, Bieszczadzki Oddział: SOC, jak funkcjonuje i kto w nim przebywa (24.07.2023)
  3. KPRM, ogłoszenie o naborze, Bieszczadzki Oddział SG (Przemyśl)
  4. AIDA (ECRE), Poland: place of detention (updated 30.07.2026)
  5. MSWiA, odpowiedź na zapytanie nr 621 (10.07.2024)
  6. MSWiA, odpowiedź na interpelację nr 14743 (03.2026)
  7. MSWiA, odpowiedź na interpelację nr 14740 (03.2026)

[1]: official source

The centres run by the Office for Foreigners (UdSC) are the nine that the Interior Ministry (MSWiA) lists in its reply to Sejm interpellation 14750 of 12 May 2026. The number of residents on 31 December 2025 and the 2025 running cost of each centre come from that reply. The ministry gives no total, and the total of PLN 38.9m used on this site is our sum of the nine figures. The running cost excludes staff wages and the allowances paid to people living outside the centres. Capacity for 2025 is published only as a total of 1,525 places (AIDA, citing Office for Foreigners data), so no centre shows a capacity of its own for 2025; where an earlier per-centre figure exists it is shown with its date. Border Guard detention is listed apart and is not accommodation: its 2025 costs and numbers held come from the ministry's replies to interpellations 14740 to 14745 (March 2026), and its places and numbers held at the end of 2025 from AIDA. The Office for Foreigners' own list of centres showed no content when we checked on 4 October 2026, so addresses and positions come from the sources named on each page and are marked approximate where they are not the publisher's own.

View on Interactive Map →